1. Cones- The orange cones are returning this year and
should be installed along the shoulder of the road before July 1st.
2. Paving- Columbia Valley Highway (from Sleepy Hollow Road to the bottom of Frosst Road) will be paved this summer. The scope of work is expected to take around 2-3 weeks, paving Mon-Fri from 7am-7pm with the exception of long weekends.